Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Fani Lezou

Project Manager
Athens,98 Ragavi

Summary

Participation in DESFA’s Projects of the Revithoussa LNG terminal as process engineer in the design group (task force) for DEPA/DESFA LNG terminal of Revithoussa (GREECE): Basic design review, process review during the detailed engineering studies, PIDs elaboration, Distribution Control System (DCS) configuration for the process design control and participation for the review of the operating and commissioning/start-up manuals.
DEPA/DESFA Project
• FEED and EPC Project : 1st expansion of LNG Terminal (sendout rate from 250 M3/h to
1.200 m3/h and unloading rate from 3.500m3/h to 7.250m3/h), (2002 – 2007)
• EPC Project : New CHP unit (2 x 6.5MW)
• FEED and EPC Project : 2nd expansion of the LNG terminal (sendout rate from 1.200m3/h
to 1.650m3/h), (2014 – 2018)
• EPC Project : DCS Upgrade of LNG Terminal from unix to MS office, (2015)
• FEED and EPC Project : 3rd LNG Tank (2014 – 2018)
• FEED and EPC Project: Truck Loading station (2020 – 2023)
• FEED : new Jetty for SSLNG vessel (2018 – in progress)

Participation in HAZOP concerning the process/utility systems and the operation and start-up manuals of the LNG Terminal/expansion phases and was in charge of coordination and resolution of interface PID review as being the process assistance to other disciplines during construction.
Excellent knowledge of European standards for LNG terminal design, construction and operation and international organization studies for LNG terminal operation (SiGTTO, GIIGNL etc).

21 years at DESFA - LNG receiving terminal of Revithoussa in Greece, as process engineer. Excellent knowledge of unloading, storage and vaporization process of LNG, as well as excellent technical background for equipment (pumps, compressors, SCV, ORV, utilities), instruments and process control. Dealt with technical assistance to operation section of the terminal, proposals and remarks on process matters of LNG terminal, equipment and units troubleshooting, proposals for small new project, operating procedures, ship compatibility with Revithoussa berth, individual process (gassing up and cool down of LNG vessels), energy/material balance and operating cost.

Overview

27
27
years of professional experience
9
9
years of post-secondary education
1
1
Language

Work History

Head

01.2020 - 01.2023
  • Of LNG Process Section, LNG Process Section, Revithoussa LNG Receiving

Process Engineer

Revithoussa LNG Receiving
01.2002 - 01.2020

Athens

PhD Theses National Technical University of, NTUA
01.1998 - 01.2002
  • National Center of Scientific Research “Demokritos”: Development of new materials via acid activation and pillaring of phylomorphous clay mineral
  • Use at clay modified electrodes, catalysis and bleaching of edible oils.

Projects Researcher

National Center of Scientific Research
01.1996 - 01.2002
  • Demokritos”
  • Development of innovative fuel cells of solid electrolyte

01.2000 - 01.2002
  • Characterization with NMR spectroscopy (solid state) of semiconductor- pigment interaction

01.1998 - 01.2000
  • Analytical practices with pillared clay modified electrodes

01.1996 - 01.1998

Project Manager

EPC New Jetty of SSLNG at Revithoussa LNG Terminal
01.2023

Education

Master of Business Administration -

ALBA Graduate Business School
Athens
01.2021 - 07.2021

License -

Technical Chamber of Greece
Athens
01.1998 - 01.1997

Ph.D. - Chemical Engineering

Athens
01.1998 - 02.2002

Chemical Engineer Diploma - National

Technical University of Athens (NTUA, Technical Chamber of Greece
01.1991 - 01.1996

MBA - Energy Management

Skills

COMPUTER SKILLS: MS Office Word, Excel, Powerpoint, Outlook, Internet)

undefined

Accomplishments

  • Participation in DESFA’s Projects of the Revithoussa LNG terminal as process engineer in the design group (task force) for DEPA/DESFA LNG terminal of Revithoussa (GREECE): Basic design review, process review during the detailed engineering studies, PIDs elaboration, Distribution Control System (DCS) configuration for the process design control and participation for the review of the operating and commissioning/start-up manuals
  • DEPA/DESFA Project
  • FEED and EPC Project : 1st expansion of LNG Terminal (sendout rate from 250 m3/h to 1.200 m3/h and unloading rate from 3.500m3/h to 7.250m3/h), (2002 – 2007)
  • EPC Project : New CHP unit (2 x 6.5MW)
  • FEED and EPC Project : 2nd expansion of the LNG terminal (sendout rate from 1.200m3/h to 1.650m3/h), (2014 – 2018)
  • EPC Project : DCS Upgrade of LNG Terminal from unix to MS office, (2015)
  • FEED and EPC Project : 3rd LNG Tank (2014 – 2018)
  • FEED and EPC Project: Truck Loading station (2020 – 2023)
  • FEED : new Jetty for SSLNG vessel (2018 – in progress)
  • Participation in HAZOP concerning the process/utility systems and the operation and start-up manuals of the LNG Terminal/expansion phases and was in charge of coordination and resolution of interface PID review as being the process assistance to other disciplines during construction
  • She has excellent knowledge of European standards for LNG terminal design, construction and operation and international organization studies for LNG terminal operation (SiGTTO, GIIGNL etc)
  • She had been working for 21 years at DESFA - LNG receiving terminal of Revithoussa in Greece, as process engineer
  • She has excellent knowledge of unloading, storage and vaporization process of LNG, as well as excellent technical background for equipments (pumps, compressors, SCV, ORV, utilities), instruments and process control
  • In her position dealt with technical assistance to operation section of the terminal, proposals and remarks on process matters of LNG terminal, equipment and units troubleshooting, proposals for small new project, operating procedures, ship compatibility with Revithoussa berth, individual process (gassing up and cool down of LNG vessels), energy/material balance and operating cost.

Timeline

Project Manager

EPC New Jetty of SSLNG at Revithoussa LNG Terminal
01.2023

Master of Business Administration -

ALBA Graduate Business School
01.2021 - 07.2021

Head

01.2020 - 01.2023

Process Engineer

Revithoussa LNG Receiving
01.2002 - 01.2020

01.2000 - 01.2002

Ph.D. - Chemical Engineering

01.1998 - 02.2002

Athens

PhD Theses National Technical University of, NTUA
01.1998 - 01.2002

01.1998 - 01.2000

License -

Technical Chamber of Greece
01.1998 - 01.1997

Projects Researcher

National Center of Scientific Research
01.1996 - 01.2002

01.1996 - 01.1998

Chemical Engineer Diploma - National

Technical University of Athens (NTUA, Technical Chamber of Greece
01.1991 - 01.1996

MBA - Energy Management

Fani LezouProject Manager