Participation in DESFA’s Projects of the Revithoussa LNG terminal as process engineer in the design group (task force) for DEPA/DESFA LNG terminal of Revithoussa (GREECE): Basic design review, process review during the detailed engineering studies, PIDs elaboration, Distribution Control System (DCS) configuration for the process design control and participation for the review of the operating and commissioning/start-up manuals.
DEPA/DESFA Project
• FEED and EPC Project : 1st expansion of LNG Terminal (sendout rate from 250 M3/h to
1.200 m3/h and unloading rate from 3.500m3/h to 7.250m3/h), (2002 – 2007)
• EPC Project : New CHP unit (2 x 6.5MW)
• FEED and EPC Project : 2nd expansion of the LNG terminal (sendout rate from 1.200m3/h
to 1.650m3/h), (2014 – 2018)
• EPC Project : DCS Upgrade of LNG Terminal from unix to MS office, (2015)
• FEED and EPC Project : 3rd LNG Tank (2014 – 2018)
• FEED and EPC Project: Truck Loading station (2020 – 2023)
• FEED : new Jetty for SSLNG vessel (2018 – in progress)
Participation in HAZOP concerning the process/utility systems and the operation and start-up manuals of the LNG Terminal/expansion phases and was in charge of coordination and resolution of interface PID review as being the process assistance to other disciplines during construction.
Excellent knowledge of European standards for LNG terminal design, construction and operation and international organization studies for LNG terminal operation (SiGTTO, GIIGNL etc).
21 years at DESFA - LNG receiving terminal of Revithoussa in Greece, as process engineer. Excellent knowledge of unloading, storage and vaporization process of LNG, as well as excellent technical background for equipment (pumps, compressors, SCV, ORV, utilities), instruments and process control. Dealt with technical assistance to operation section of the terminal, proposals and remarks on process matters of LNG terminal, equipment and units troubleshooting, proposals for small new project, operating procedures, ship compatibility with Revithoussa berth, individual process (gassing up and cool down of LNG vessels), energy/material balance and operating cost.